Monolithic or industrial housing construction? Justification of the choice in numbers

封面

如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅或者付费存取

详细

In 2025 the construction industry faces bold and dangerous challenges requiring a well-thought-out strategy. All players on the market have already faced an construction costs increase, a monetary policy tightening, a shortage in personnel and a decrease in demand due to high mortgage interest rates. In modern conditions construction companies need new approaches of doing business – optimize costs and use various industry support mechanisms. One of the most effective solutions is the transition to industrial housing construction which makes quick building of high-quality facilities possible. But despite the advantages of this technology, monolithic construction still prevails in many regions. This is caused by the existing developers’ doubts regarding the panel houses quality and technology, as well as uncertainty about the financial profitability of the transition to industrial housing construction. Petro Building Systems conducted a large-scale study and provided analytics on key indicators of monolithic and industrial construction.

全文:

受限制的访问

参考

补充文件

附件文件
动作
1. JATS XML
2. Fig. 1.

下载 (292KB)
3. Fig. 2

下载 (559KB)
4. Fig. 3

下载 (469KB)
5. Fig. 4

下载 (458KB)
6. Fig. 5

下载 (657KB)
7. Fig. 6

下载 (491KB)

版权所有 © Advertising publishing company "STROYMATERIALY", 2025